Department project management system

      

ABSTARCT :

Managing and controlling the final year projects of students using manual or traditional process is a very tedious job. The main aim of this project is to create an automated system for managing all the activities of projects. Project management system is a system for managing, controlling, monitoring the final year projects of students. It is a web based portal or application which is useful for students, project coordinator and project guide. Firstly all the students need to register into the system using registration form. Then registered students can login into the system using their id and password to get authenticated. When the students login to the system, then they will form the groups by their own. Similarly, project guide needs to login into the system using their id and password. PMS also allows the group of the students to provide at least three project domains and then system will automatically assign the guides to the group of students. Project coordinator is main aspect of the system which will assign different tasks to the students. Project coordinator and project guide is co-ordinate with each other. Depending upon the different parameters, the work is assigned by the coordinator and the progress chart of the group is created. For creating progress chart we are using a work breakdown structure (WBS). Depending on progress charts the marks will automatically get assigned for particular group of the students.

EXISTING SYSTEM :

? Existing system of system of project management is manual. Project coordinator or guide gives task for student manually. ? Student complete the work which is given by coordinator or guide and submits manually, in this system all work is done by manually so it can take more time to complete project related work. ? Project coordinator or guide requires remembering in mind when student completed the work so it is difficult for Project coordinator or guide which student completed the task and when. ? In the existing system does not help users to get right information at right time and user cannot manage project development easily to achieve the main goal.

DISADVANTAGE :

? 1. It is time consuming. ? 2. Right information is not retrieved at right time. ? 3. Any updates to the data by team members or the Project coordinator or guide cannot see immediately by the rest of the team. ? 4. All work is done manually

PROPOSED SYSTEM :

• In this proposed system we can implement a system which can manage project cognate all work consummated by utilized and Project coordinator or guide. • Coordinator updates project cognate information, view work done by a student at which time and view progress chart of work done by student, progress chart is developed utilizing WBS (“Work Breakdown Structure”). • Student retrieved the given work information updates and consummates this work at given time and submits into the project management system.

ADVANTAGE :

? The project management system as a database of management information upon which to make strategic decisions concerning the companies operating performance. ? The aim of strategic programme management was to improve control over work operations and utilise human resource skills as efficiently as possible. ? The nature of project development results in peaks and troughs for specific types of skills. ? To date while much research has been conducted on micro-electronic technologies and their impacts few studies have investigated the nature of project management software, its control capabilities and how it can be designed and used to increase managerial control over human resources.

Download DOC Download PPT

We have more than 145000 Documents , PPT and Research Papers

Have a question ?

Chat on WhatsApp