Issue Tracker PHP Project
ABSTARCT :
There have been many applications oriented around controlling and tracing the lifecycle of project, tasks, and requirements. In the beginning of this work, the author provides an introduction into the problematic of the above-mentioned tracing, mentioning also software development methods and how they relate to this theme. In the second part of the work, the currently most popular tools for issue / bug tracking will be examined and then the reader will get acquainted with the possibility of their integration into development environments. In the last chapter, the development of plug-in for NetBeans IDE is presented, which would make it easier for developers to use advantages of the JIRA tracking system.
EXISTING SYSTEM :
? Things Going Manually
? No Data Base is used Upton now
? Not providing any security to the data
DISADVANTAGE :
? This type is usually chosen by people who are not sure how to categorize their problem, and later is usually changed to some other type (bug/enhancement) or closed.
? Problem is marked as “Known problem,” indicating that the problem or a similar request is already known, and either a workaround exists for handling it, or it is approximately scheduled some time when the proper fix of the problem can be expected .
? Duplicate status, again, indicates that the problem is found as a duplicate of an existing issue.
? The first part of the description should be the shortest step-by-step statement of how to get to the problem.
PROPOSED SYSTEM :
• By using this software the registered users can ask the issue they have to the admin and get solution that issue from admin user can ask any type of question related to subjects in this project.
ADVANTAGE :
? These organizations usually operate through "heroic performance" of individuals.
? These organizations have managers who collect data on processes performance characteristics and on the satisfaction of customers.
? To measure the quality of the process, there are defined measurable objectives, which are also used for management of process performance.
? The highest level of maturity involves measurably controlled processes, which are also changed and developed, so as to permit the performance of current and planned business objectives of the organization.
|